System and method for distribution of dependent builds across orchestration job scheduler slaves
US11599385B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 2, 2019 |
| Grant date | Mar 7, 2023 |
| Priority date | — |
| Expiry date | Aug 2, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3688
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method, computer program product, and computer system for obtaining an input for a build. An initial orchestration job scheduler object may be obtained based upon the input for the build. A directed acyclic graph (DAG) may be determined based upon, at least in part, a dependency engine preprocessing. The DAG may be stored in a format. An array of steps may be built based upon, at least in part, the object, wherein the DAG may be translated from the object into a format readable by an initial orchestration job scheduler to build the array of steps. The array of steps may be executed to perform the build.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.