Patent · US Active

System and method of schedule optimization for long-range staff planning

US11610163B2 · kind B2 · utility

0Cited by
13References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 30, 2022
Grant dateMar 21, 2023
Priority date
Expiry dateMay 30, 2042

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06315
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system and method are disclosed for determining long-range staff planning. Embodiments include determining a baseline measurement of labor needs over a time period of one or more employees at one or more entities and modifying the baseline measurement of the labor needs over the time period based on one or more constraints that allow the one or more employees to work additional types of labor needs at the one or more entities. Embodiments further include determining working times and job assignments of the one or more employees based on one or more simulated employees that represent potential employees to the modified baseline measurement of the labor needs over the time period and storing the determined working times and job assignments in the database for the one or more employees at the one or more entities.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.