Evaluating workload for database migration recommendations
US11615061B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 3, 2018 |
| Grant date | Mar 28, 2023 |
| Priority date | — |
| Expiry date | Jun 8, 2039 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F16/254
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A workload of a database may be evaluated to provide a database migration recommendation. A request for a recommendation to migrate a database to a new host may be received. An evaluation of the workload of a client application of the database at a current host may be performed. The migration recommendation may be returned based on the evaluation of the workload of the client application of the database. In some embodiments, the migration recommendation may trigger an automated migration of the database to the new host.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.