Patent · US Active

Estimate active-adjacent borehole interference severity

US11619126B2 · kind B2 · utility

0Cited by
3References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 4, 2020
Grant dateApr 4, 2023
Priority date
Expiry dateMar 19, 2041

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/22
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A process to determine whether a leak-off event is occurring during the treatment stage of an active borehole. The leak-off event data, such as the severity or magnitude of the potential leak-off, can be communicated to other systems to adjust the treatment stage, the fluid composition, the fluid pressure, or the fluid flow rate. Diverter material can be added to the fluid. The monitoring of the leak-off event can occur over a time interval, such as the time of the treatment stage and periodic adjustments to the treatment stage can be implemented. The leak-off event can be identified when a fluid pressure slope indicates an overall increase in pressure in an adjacent borehole or if the amount of fluid entering an adjacent borehole exceeds a leak-off threshold.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.