Patent · US Active

Real-time labor tracking and validation on a construction project using computer aided design

US11620599B2 · kind B2 · utility

3Cited by
10References
8Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 9, 2021
Grant dateApr 4, 2023
Priority date
Expiry dateApr 9, 2041

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q50/08
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

An improved way of managing the labor expended on a construction project, whether a small-scale or large-scale, includes a system, program and method that will use the estimate of labor for a project as an input to the labor management system. The percent complete of the project will be a calculation of installed equipment as opposed to a perceived percent complete of the project. The calculation will be compared to the percent of labor hours used to then determine the state of the construction project. The labor management calculation will be facilitated through a user interface where the user can highlight one or more portions of the virtual project, where the one or more portions represent one or more installed units of the project, such as installed equipment.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.