Patent · US Active

Seasonal electrical resource allocation

US11621566B1 · kind B1 · utility

1Cited by
0References
12Claims
0Family size

Assignee

Inventor

Key dates

Filing dateOct 5, 2022
Grant dateApr 4, 2023
Priority date
Expiry dateOct 5, 2042

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH02J2300/24
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

An REPP may include a renewable energy source (RES), a first meter associated with a first load, a second meter associated with a second load, a first ESS electrically coupled to the RES and the first meter, a second ESS electrically coupled to the RES and the first meter through a switch, and a controller configured to set a first charge/discharge for the first ESS and a second charge/discharge for the second ESS such that the REPP delivers power to the first load longer than the RES produces power, in response to a trigger condition, actuate the switch such that the second ESS is electrically coupled to the second meter, and set a fourth charge/discharge for the second ESS such that the second ESS maintains a portion of its charge in reserve for the second load.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.