Power grid resource allocation
US11630429B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Dec 21, 2020 |
| Grant date | Apr 18, 2023 |
| Priority date | — |
| Expiry date | May 19, 2041 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S50/10
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A method of operating a power grid includes: generating, by a power management system of the power grid, an intermediate resource allocation schedule that provides a tentative schedule of resource allocation for power grid resources operating within the power grid; determining, by the power management system, whether the intermediate resource allocation schedule is feasible by checking whether the intermediate resource allocation schedule satisfies coupling constraints of a power grid resource allocation profile of the power grid indicative of an operation of the power grid constrained by power grid operational information; and in response to determining that the intermediate resource allocation schedule is infeasible, repairing, by the power management system, the intermediate resource allocation schedule to generate a feasible resource allocation schedule, where the repairing comprises determining whether a first dispatch solution obtained by solving a dispatch problem with fixed integer decisions from the intermediate resource allocation schedule is feasible.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.