Patent · US Active

Cloud data migration

US11635903B2 · kind B2 · utility

1Cited by
1References
2Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 15, 2021
Grant dateApr 25, 2023
Priority date
Expiry dateJul 17, 2041

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F3/067
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A data storage change is received for a piece of data, wherein the data storage change is from a first location to a second location. Two or more possible paths to perform the data storage change are determined. A plurality of weights for each path of the two or more paths is determined. A weighted transfer time for each path of the two or more paths is determined.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.