Construction method
US11643786B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 17, 2019 |
| Grant date | May 9, 2023 |
| Priority date | — |
| Expiry date | Jan 17, 2039 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE02D2600/10
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
The invention relates to a construction method, in which an excavation pit is produced in the ground and in the excavation pit foundation elements are produced at predetermined working points with at least one working apparatus. According to the invention provision is made in that in a computer unit the dimensions of the excavation pit, the working points and the dimensions of the at least one working apparatus are entered and in that in the computer unit a required workspace for the at least one working apparatus and an open space in the excavation pit are determined automatically.