Pull request risk prediction for bug-introducing changes
US11645188B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 16, 2021 |
| Grant date | May 9, 2023 |
| Priority date | — |
| Expiry date | Nov 16, 2041 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3608
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
In an approach to risk prediction for bug-introducing changes, a computer retrieves one or more historic pull requests. A computer determines a unique file linking for each file included in the historic pull requests. A computer generates a file risk dataset. A computer performs chronological partitioning on the file risk dataset. A computer determines bug-introducing changes in the file risk dataset. A computer computes a collaborative file association between two or more of the files in the file risk dataset. A computer labels each of the files in the file risk dataset with an associated risk of introducing a bug. A computer generates a labelled file risk inducing ground truth dataset. A computer inputs the labelled file risk inducing ground truth dataset to a file risk prediction model. A computer extracts pull request features from the historic pull requests. A computer generates a pull request risk prediction model.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.