System and method for proactive management of components based on service availability
US11646951B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 22, 2022 |
| Grant date | May 9, 2023 |
| Priority date | — |
| Expiry date | Jul 22, 2042 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L41/0806
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
Methods and systems for managing data processing system are disclosed. A data processing system may include one or more hardware and/or software components. The operation of the data processing system may depend on the operation of these components. To manage the operation of the data processing system, future failures of the hardware components may be predicted and used as a basis for predicted services to reduce the threat of the predicted component failures. To manage performance of the predicted services, the predicted services may be scheduled for performance. To schedule performance of the predicted services, limitations on availability of service professionals that may complete the predicted services may be taken into account.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.