Patent · US Active

Maximum power point tracking through load management

US11658483B2 · kind B2 · utility

0Cited by
8References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 16, 2021
Grant dateMay 23, 2023
Priority date
Expiry dateDec 16, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E10/56
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A load management system for a solar photovoltaic (PV) system is disclosed. The load management system may include a PV array of solar modules, a plurality of loads configured to be powered by the PV array and switched on or off by a plurality of respective relays, a power sensor configured to measure an amount of power delivered from the PV array to the plurality of loads, and a controller coupled to the power sensor and the plurality of relays. The controller may be configured to determine a first power output of the PV array at a first time, switch a load, determine a second power output of the PV array at a second time, compare the first power output and the second power output, and based on the comparison, maintain the switched load or undo the switching of the load.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.