Fracturing control method and fracturing system
US11702920B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 21, 2022 |
| Grant date | Jul 18, 2023 |
| Priority date | — |
| Expiry date | Sep 21, 2042 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/02
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A fracturing control method is applied to a fracturing system including a plurality of fracturing pump sets. The method includes: turning on a first fracturing pump set according to a total required output of the fracturing system and priorities of the plurality of fracturing pump sets; adjusting an operating parameter of the first fracturing pump set according to an actual output of the first fracturing pump set and an output threshold corresponding to the first fracturing pump set, so that the actual output of the first fracturing pump set is f1 times the output threshold; and if the operating output of the first fracturing pump set is less than the total required output, turning on a second fracturing pump set, a priority of the second fracturing pump set being lower than a priority of the first fracturing pump set.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.