Patent · US Active

Fracturing of a deep or wet well utilizing an air/fuel mixture and multiple stage restriction orifice assembly

US11761319B2 · kind B2 · utility

0Cited by
9References
20Claims
0Family size

Assignee

Inventor

Key dates

Filing dateMay 27, 2022
Grant dateSep 19, 2023
Priority date
Expiry dateMay 27, 2042

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/248
  • WIPO fieldBasic materials chemistry
  • WIPO sectorChemistry

Abstract

A method of producing subterranean fractures in geologic formations having a significant amount of water present (a wet well) and/or at deep locations (1.5-2 miles or more) for the extraction of hydrocarbons therefrom includes flowing an explosive hydrophobic emulsion mixture to protect the air and fuel mixture subsequently flowed into a well hole. The build-up of pressure using a multiple plate restriction orifice assembly eventually causes auto-ignition of the air and fuel mixture which fractures the formation for recovery of the hyrdrocarbons.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.