Behind the meter flow control to separate renewable energy

US11769218B1 · kind B1 · utility

2Cited by
13References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 22, 2022
Grant dateSep 26, 2023
Priority date
Expiry dateDec 22, 2042

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH02J2300/40
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A system includes a first renewable energy source (RES) configured to provide electrical energy; a first circuit comprising a first energy storage system (ESS) and a point of interconnection (POI) coupled to a power grid; a second circuit comprising a second ESS and a source-sensitive destination; and a first switch configured to selectively connect one of the first circuit or the second circuit to the first RES.