Behind the meter flow control to separate renewable energy
US11769218B1 · kind B1 · utility
2Cited by
13References
19Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Dec 22, 2022 |
| Grant date | Sep 26, 2023 |
| Priority date | — |
| Expiry date | Dec 22, 2042 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH02J2300/40
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A system includes a first renewable energy source (RES) configured to provide electrical energy; a first circuit comprising a first energy storage system (ESS) and a point of interconnection (POI) coupled to a power grid; a second circuit comprising a second ESS and a source-sensitive destination; and a first switch configured to selectively connect one of the first circuit or the second circuit to the first RES.