Local deep excavation and backfilling structural subgrade and its rapid construction method

US11781280B2 · kind B2 · utility

0Cited by
0References
7Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 7, 2022
Grant dateOct 10, 2023
Priority date
Expiry dateApr 7, 2042

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE02D29/05
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A subgrade with local deep excavation and backfilling structure and a rapid construction method thereof are provided. Supporting cast-in-place piles are laid at positions where an underground pipe gallery is located in a subgrade structure, and soil there between are longitudinally excavated to form a line-shaped foundation pit. A bottom of the line-shaped deep foundation pit is reinforced to support the underground pipe gallery, and lateral peripheral regions and top peripheral regions of the underground pipe gallery are backfilled with block geobag reinforced fillers. Geogrids are placed on the top of the underground pipe gallery, then backfilling compaction and reinforcing are performed, and the geogrids are fixedly assembled with anchor bolts. The construction method is simple and easy. By using compacted block geobag reinforced fillers and cement solidified slurry, an overall quality of the subgrade structure after backfilling can be ensured, and construction period and cost can be greatly reduced.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.