Patent · US Active

Application for priority-switching dual-use renewable power plant

US11782399B1 · kind B1 · utility

3Cited by
14References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 20, 2023
Grant dateOct 10, 2023
Priority date
Expiry dateApr 20, 2043

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH02J2300/20
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A system for controlling power distribution between a renewable energy source (RES) that generates electrical power, a power grid, an energy storage system (ESS) coupled to and configured to store electrical power from the RES and the power grid, and a behind-the-meter (BTM) load coupled to and configured to receive electrical power from the RES, the ESS, and the power grid includes a controller. The controller includes a processor and a non-transitory computer readable storage medium comprising instructions stored thereon that, upon execution by the processor, cause the controller to determine a prioritization mode and control the flow of electrical power in the system based on the prioritization mode.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.