Intermediate representation construction method, compiler, and server
US11789709B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 17, 2022 |
| Grant date | Oct 17, 2023 |
| Priority date | — |
| Expiry date | Mar 17, 2042 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F8/4441
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
An intermediate representation construction method is provided. The method includes: obtaining a first intermediate representation (IR), where the first IR includes a computing statement, the computing statement includes a tensor and an operator, an operation represented by the operator is performed by a computing unit, the computing unit is configured to perform an operation on data that is migrated through a first storage location and a second storage location sequentially, and the tensor is data that is used when the operation represented by the operator is performed; and generating a second IR based on the computing statement, where the second IR includes first data migration information and data segmentation information.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.