Inspection project manager
US11790463B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 20, 2020 |
| Grant date | Oct 17, 2023 |
| Priority date | — |
| Expiry date | Dec 21, 2041 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/30
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A system comprises a server including a port, memory and processing circuitry. The port is configured to receive (i) a drawing file associated with an isometric drawing of an asset at an inspection site including indications of condition monitoring locations (CMLs) for the asset, and (ii) inspection measurement data for the asset, the inspection measurement data including inspection measurements associated with the CMLs. The memory is configured to store the drawing file and the inspection measurement data. The processing circuitry is configured to use the inspection data and the drawing file to generate, using the inspection measurement data and the drawing file, (i) survey image data for display and (ii) metadata for the survey image data, the metadata including survey image coordinates for the CMLs and the inspection measurements associated with the CMLs.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.