Method for real-time strength estimation, grading, and early warning of rock mass in tunnel boring machine (TBM) tunneling
US11808152B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | Feb 2, 2023 |
| Grant date | Nov 7, 2023 |
| Priority date | — |
| Expiry date | Feb 2, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2119/14
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method for real-time strength estimation, grading, and early warning of rock mass in tunnel boring machine (TBM) tunneling, and belongs to the technical field of TBM tunnel construction. The method includes the following steps: establishing a general relation model of equivalent strength Rec of the TBM boring rock mass and a field penetration index (FPI); and applying the model to TBM boring construction, estimating an integrity coefficient Kv of the TBM boring rock mass in real time according to boring parameters acquired by a TBM in real time, and performing grading and early warning on the TBM boring rock mass according to a given grading standard and early warning values.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.