Patent · US Active

Supporting electrical utility performance with dispatchable distributed energy resources

US11811227B2 · kind B2 · utility

1Cited by
2References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 25, 2021
Grant dateNov 7, 2023
Priority date
Expiry dateJun 25, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S20/222
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

Distributed energy resources are validated by dispatching a distributed energy resources individually in known ambient conditions and monitoring the particular effect of dispatch to then establish a database of performance for multiple different distributed energy resources. The distributed energy resources can be permanently monitored to further build up this database and to verify that the distributed energy resource 1s performing consistent with its validation or other expected performance. Distributed energy resources of a slow responding variety and a fast responding variety can be paired together and dispatched together, so that the paired fast responding and slow responding distributed energy resources mimic a large fast responding distributed energy resource. The benefits of a high capacity fast responding distributed energy resource is thus provided, such as for the load shedding and grid support benefits thereof.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.