System and method for management of workload distribution
US11811862B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 26, 2023 |
| Grant date | Nov 7, 2023 |
| Priority date | — |
| Expiry date | Apr 26, 2043 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L41/145
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
Methods and systems for managing workloads are disclosed. The workloads may be supported by operation of workload components that are hosted by infrastructure. The hosted locations of the workload components by the infrastructure may impact the performance of the workloads. To manage performance of the workloads, an optimization process may be performed to identify a migration plan for migrating some of the workload components to different infrastructure locations. Some of the different infrastructure locations may reduce computing resource cost for performance of the workloads.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.