System and method for adjusting leaching operations based on leach analytic data

US11823099B1 · kind B1 · utility

16Cited by
3References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 25, 2023
Grant dateNov 21, 2023
Priority date
Expiry dateApr 25, 2043

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P10/20
  • WIPO fieldMaterials, metallurgy
  • WIPO sectorChemistry

Abstract

The method may comprise receiving historical data (e.g., mineralogy data, irrigation data, raffinate data, heat data, lift height data, geographic data on ore placement and/or blower data); training a predictive model using the historical data to create a trained predictive model; adding future assumption data to the trained predictive model; running the forecast engine for a plurality of parameters to obtain forecast data for a mining production target; comparing the forecast data for the mining production target to the actual data for the mining production target; determining deviations between the forecast data and the actual data, based on the comparing; and changing each of the plurality of parameters from the forecast data to the actual data to determine a contribution to the deviations for each of the plurality of parameters.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.