Patent · US Active

Collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting

US11834949B2 · kind B2 · utility

3Cited by
0References
2Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 3, 2023
Grant dateDec 5, 2023
Priority date
Expiry dateMar 3, 2043

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21D21/02
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting provided by the disclosure includes the following steps: step 1, driving into a coal seam to release pressure; step 2, low roof pre-splitting during driving process; step 3, supporting of roadway surrounding rock and support reinforcement; step 4, floor destressing of the roadway; step 5, high roof pre-splitting before mining; step 6, destressing and supporting of the advanced roadway surrounding rock during the mining process of the working face. The collaborative erosion-control method of releasing-splitting-supporting based on coal mass pressure relief and roof pre-splitting, and to carry out local pressure relief, roof pre-splitting and reinforcement support construction in the whole cycle of the coal working face in a progressive manner, so as to achieve the prevention and control of rock burst in the working face.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.