Patent · US Active

Methods and systems for deploying equipment required to meet defined production targets

US11836659B2 · kind B2 · utility

0Cited by
5References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 8, 2021
Grant dateDec 5, 2023
Priority date
Expiry dateDec 8, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Methods of deploying shovels and haul trucks to meet a defined production target may include: Determining at least one production constraint for a shovel and a material processing system; estimating an effect of entropy on a cycle time of the haul trucks to produce a future cycle time estimate; estimating an effect of entropy on a material processing time of the material processing system to produce a future material processing time estimate; predicting whether a delay will occur during the operation of the shovel, the haul trucks, and the material processing system; estimating a duration of the predicted delay; determining a number of shovels and a number of haul trucks required to meet the defined production target based on the determined production constraint, the future cycle time estimate, the future material processing time estimate, and the duration of the predicted delay; and deploying the determined number of shovels and the determined number of haul trucks.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.