Method for constructing steel sheet pile cofferdam on deep sand gravel overburden layer

US11840817B2 · kind B2 · utility

0Cited by
11References
10Claims
0Family size

Assignees

Inventors

Key dates

Filing dateJun 22, 2022
Grant dateDec 12, 2023
Priority date
Expiry dateJun 22, 2042

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE02D19/04
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for constructing a steel sheet pile cofferdam is provided, including: step S1, determining a construction area of the steel sheet pile cofferdam; step S2, piling steel casings, and welding guide frame brackets to the steel casings, the guide frame brackets are connected with a guide frame and limiting clamp plates; step S3, piling steel sheet piles by relying on the guide frame; step S4, pouring subsealing concrete at a bottom of the steel sheet pile cofferdam; step S5, arranging purlins and internal supports within the steel sheet pile cofferdam; step S6, perform a secondary subsealing at the bottom of the steel sheet pile cofferdam; step S7, pumping water within the steel sheet pile cofferdam through a pump and pouring to form a bearing platform on the subsealing concrete; step S8, removing the steel sheet pile cofferdam after the bearing platform is formed.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.