Rule-based modeling for building control systems
US11843475B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 18, 2022 |
| Grant date | Dec 12, 2023 |
| Priority date | — |
| Expiry date | May 18, 2042 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B2219/2642
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
Rule-based modeling for building control systems is described herein. One device includes a memory, a user, interface, and a processor configured to execute executable instructions stored in the memory to display, in a single view on the user interface, a listing of all components of a facility controlled by a building control system, display, in an additional view on the user interface, a number of rules for mapping the components of the facility to a common model of the building control system, map the components of the facility to the common model by applying the number of rules to the components of the facility, and display, in the additional view on the user interface, the components of the facility that have been mapped to the common model.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.