Controlling scheduling of a GPU

US11847492B2 · kind B2 · utility

0Cited by
0References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 9, 2016
Grant dateDec 19, 2023
Priority date
Expiry dateSep 22, 2038

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

The operation of a GPU is controlled based on one or more deadlines by which one or more GPU tasks must be completed and estimates of the time required to complete the execution of a first GPU task (which is currently being executed) and the time required to execute one or more other GPU tasks (which are not currently being executed). Based on a comparison between the deadline(s) and the estimates, context switching may or may not be triggered.