Patent · US Active

Methods and systems for deploying equipment required to meet defined production targets

US11847595B2 · kind B2 · utility

0Cited by
6References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 8, 2021
Grant dateDec 19, 2023
Priority date
Expiry dateDec 29, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Methods and systems determine at least one production constraint for a material loading system and a material processing system; estimate an effect of entropy on a cycle time of a material conveying system to produce a future cycle time estimate; estimate an effect of entropy on a material processing time to produce a future material processing time estimate; predict whether a delay will occur during the operation of the material loading, material conveying, and material processing systems; estimate a duration of the predicted delay; determine a loading system capacity and a conveying system capacity required to meet the defined production target based on the production constraint and estimates of the future cycle time, the future material processing time, and the duration of the predicted delay; and deploy one or more material loading and conveying systems to meet the determined loading and conveying system capacities.