Patent · US Active

Cement top job with non-retrievable tubing

US11859465B2 · kind B2 · utility

0Cited by
8References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 8, 2021
Grant dateJan 2, 2024
Priority date
Expiry dateDec 8, 2041

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B34/06
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for cementing a wellbore having a lost circulation zone includes installing a cement basket around a casing string having a casing diameter, and running and setting the casing string in the wellbore. The cement basket is set in proximity of and up hole from the lost circulation zone. The method includes pumping a cement slurry, through the casing string, to a first depth downhole from the cement basket, running a first tubing, having a tubing diameter, into an annulus between the casing string and the wellbore, and pumping the cement slurry, through the first tubing, to a second depth up hole from the cement basket. The tubing diameter is less than the casing diameter.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.