Fronthaul configuration based on facilitating cell allocation to baseband units and hubs of a communications network
US11863474B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 27, 2019 |
| Grant date | Jan 2, 2024 |
| Priority date | — |
| Expiry date | Apr 25, 2040 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04W88/085
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
A system, method and non-transitory computer readable media for facilitating network connectivity in a split architecture fronthaul network (102) comprising a plurality of cells (118-1 to 118-5, 120-1 to 120-5) and one or more BBU hubs (108A, 108B), each hub comprising at least a BBU (110-N, 112-M). An example cell allocation process (400B, 500A) is configured to assign cells to the hubs sequentially, i.e., a hub must be completely full (e.g., with respect to certain predetermined capacity such as port utilization) before adding cells to any other hubs. Once a hub is full, the allocated cells are further assigned to the individual BBUs of the hub also sequentially (500B). An optimal cell allocation map (418) is thereby obtained, which may be used in (re)configuring the connectivity between the cells (118-1 to 118-5, 120-1 to 120-5) and the hubs/BBUs (110-N, 112-M).
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.