Managing dependencies between work items tracked by a host service of a project management system

US11875287B2 · kind B2 · utility

1Cited by
17References
17Claims
0Family size

Assignees

Inventors

Key dates

Filing dateJun 22, 2020
Grant dateJan 16, 2024
Priority date
Expiry dateJun 22, 2040

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F3/04842
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A computer implemented method comprising displaying a scheduling interface including a first work item user interface element corresponding to a first work item and a second work item user interface element corresponding to a second work item; detecting a create dependency interaction; and, in response to detecting the create dependency user interaction, creating a dependency relationship between the first and second work items.