Industrial automation distributed project control with milestone rollback
US11880680B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 17, 2023 |
| Grant date | Jan 23, 2024 |
| Priority date | — |
| Expiry date | Mar 17, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B2219/36062
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
An industrial integrated development environment (IDE) supports collaborative tools that allow multiple designers and programmers to remotely submit design input to the same automation system project in parallel while maintaining project consistency. The industrial IDE also permits localized development of system projects, and provides an infrastructure for intelligently brokering between conflicting edits submitted to common portions of the system project. Project edits submitted to the IDE system, both applied and unapplied, are stored as edit records, allowing edits to be selectively undone or applied either manually or as part of a rollback to a milestone version.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.