Patent · US Active

Extremum seeking control of distributed energy resources with decaying dither and equilibrium-based switching

US11881709B2 · kind B2 · utility

0Cited by
0References
11Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 8, 2021
Grant dateJan 23, 2024
Priority date
Expiry dateApr 18, 2041

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S40/20
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

Embodiments relate to an operating system coupled to and controlling at least one Distributed Energy Resource (DER) in a smart grid and includes an electricity distribution network and a 2-dimensional Extremum Seeking (2D-ES) controller coupled to network. The electricity distribution network has first and second inputs and one output and maps all active power and reactive power inputs to the smart grid providing measurements of an objective function. The 2D-ES controller controls the DER and includes an active power loop and a reactive power loop. The active power loop is in communication with the first input and the output, governs active power contribution, and receives measurements of the objective function which contain static and oscillatory components. The reactive power loop is in communication with the second input and the output, governs reactive power contribution, and receives measurements of the objective function which contain static and oscillatory components.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.