Patent · US Active

System and method for management of workload distribution for transitory disruption

US11888930B1 · kind B1 · utility

0Cited by
0References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 26, 2023
Grant dateJan 30, 2024
Priority date
Expiry dateApr 26, 2043

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L67/1008
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Methods and systems for managing workloads are disclosed. The workloads may be supported by operation of workload components that are hosted by infrastructure. The hosted locations of the workload components by the infrastructure may impact the performance of the workloads. To manage performance of the workloads, an optimization process may be performed to identify a migration plan for migrating some of the workload components to other infrastructure such as shared edge infrastructure and cloud infrastructure temporarily or permanently. Migration of the workload components may reduce the computing resource cost for performing various workloads and/or reduce workload performance disruptions.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.