Patent · US Active

Optimization under uncertainty for integrated models

US11899161B2 · kind B2 · utility

0Cited by
3References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 25, 2016
Grant dateFeb 13, 2024
Priority date
Expiry dateOct 7, 2039

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01V2210/74
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

A method can include receiving realizations of a model of a reservoir that includes at least one well where the realizations represent uncertainty in a multidimensional space; selecting a portion of the realizations in a reduced dimensional space to preserve an amount of the uncertainty; optimizing an objective function based at least in part on the selected portion of the realizations; outputting parameter values for the optimized objective function; and generating at least a portion of a field operations plan based at least in part on at least a portion of the parameter values.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.