Implementing power delivery transaction for potential electrical output of integrated renewable energy source and energy storage system facility
US11916383B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 21, 2023 |
| Grant date | Feb 27, 2024 |
| Priority date | — |
| Expiry date | Jul 21, 2043 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH02J2300/28
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A method for implementing power delivery of an integrated renewable energy source and energy storage system (RES−ESS) facility includes a renewable energy source (RES) and an energy storage system (ESS). The method comprises obtaining a first control rule configured to be used to control power distribution in the RES−ESS facility for a time slot, wherein the power distribution includes directing power from a renewable energy source (RES) to an electric grid and to an energy storage system (ESS) and power from the ESS to the electric grid; receiving a second control rule configured to be used to control the power distribution in the RES−ESS facility, wherein the second control rule was used to control the power distribution in the RES−ESS facility for the time slot; determining a difference in performance of the RES−ESS facility; and transmitting a record comprising an identification of the difference in performance.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.