Resource management
US11916810B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 23, 2023 |
| Grant date | Feb 27, 2024 |
| Priority date | — |
| Expiry date | Mar 23, 2043 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L47/822
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
According to one aspect, a system for resource management may perform receiving a total resource request, a vector of two or more maximum available resources associated with two or more corresponding resource providers, and a number of resource providers and calculating an individual resource request for each of the two or more resource providers by iteratively comparing the vector of two or more maximum available resources with a vector of a current average resource residual, taking a minimum between those vectors as a running tally for the individual resource requests, and recalculating the current average resource residual.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.