Reasonable millisecond time control method for excavation blasting of tunnel

US11920472B2 · kind B2 · utility

0Cited by
2References
8Claims
0Family size

Assignees

Inventors

Key dates

Filing dateSep 20, 2023
Grant dateMar 5, 2024
Priority date
Expiry dateSep 20, 2043

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF42D3/04
  • WIPO fieldOther special machines
  • WIPO sectorMechanical engineering

Abstract

A reasonable millisecond time control method for excavation blasting of a tunnel is provided, and includes: acquiring physical mechanical parameters to establish a millisecond blasting model, and designing four dimensions blasting parameters of explosive quantity, hole number, inter-hole millisecond and inter-row millisecond; simulating, based on the millisecond blasting model, a blasting process of an explosive package using blasting parameters to obtain a blasting vibration curve; obtaining single-hole blasting vibration waveforms, solving a vibration synthesis curve through a vibration synthesis theory; comparing the vibration synthesis curve with the blasting vibration curve to obtain a coupling relationship of blasting parameters; determining a target group of explosive quantity and hole numbers, determining a target millisecond through the coupling relationship of blasting parameters, and relating a millisecond blasting control strategy to control, and it is used for tunneling project to reduce cut blasting vibration intensity and achieve precise and intelligent control of millisecond blasting.