Building management system and method with timeseries sample feedback control
US11927947B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 9, 2022 |
| Grant date | Mar 12, 2024 |
| Priority date | — |
| Expiry date | May 9, 2042 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B2219/2642
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
A building management system includes building equipment operable to affect a physical state or condition of a building, a system manager, and a cloud-based data platform. The system manager is coupled to the building equipment via a system bus and configured to obtain alarm data from the building equipment and generate a timeseries sample including the alarm data. The cloud-based data platform includes a timeseries service configured to receive the timeseries sample from the system manager, extract the alarm data from the timeseries sample, and store the alarm data as a sample of an alarm timeseries.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.