Patent · US Active

Method for determining active jacking force of tunneling closely undercrossing existing station

US11946831B2 · kind B2 · utility

0Cited by
2References
4Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 28, 2023
Grant dateApr 2, 2024
Priority date
Expiry dateApr 28, 2043

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01M5/0025
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

Determining an active jacking force of a tunneling closely undercrossing existing station, includes: acquiring design parameters of stations, and geological parameters of a construction site; obtaining a stress solution expression of the active jacking force on the existing station to obtain a stress solution of any point in a semi-infinite space under the action of a vertical load, replacing the vertical load with a vertical load acting on the existing station, and obtain a vertical stress solution of the existing station; obtaining a relational expression between the deflection and the stress solution of the existing station; and substituting the stress solution expression of the active jacking force into the relational expression between the deflection and the stress solution of the existing station according to boundary conditions at both ends of a beam on elastic foundation to obtain the active jacking force that controls the deflection of the existing station.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.