Patent · US Active

CTC3.0-based implementation method for route handling of regional centralized control station

US11952023B2 · kind B2 · utility

0Cited by
0References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 19, 2020
Grant dateApr 9, 2024
Priority date
Expiry dateOct 19, 2040

Classification

  • Technology area (CPC B)Performing Operations; Transporting
  • CPC primaryB61L2027/204
  • WIPO fieldTransport
  • WIPO sectorMechanical engineering

Abstract

A method for route handling of a regional centralized control station is based on a CTC3.0 technology, and includes the following steps: step (1): generating multi-station train and shunting plans according to a multi-station planning terminal, and executing steps (2) and (4) at the same time; step (2): sending the train plan to an autonomous computer to generate a train route sequence, and executing step (3); step (3): sending, by the autonomous computer, the train route sequence to a regional centralized control route handling terminal; step (4): compiling, by the multi-station planning terminal, an automatically generated shunting route sequence in the shunting plan, and executing step (5); and step (5): synchronizing, by a center service, the shunting route sequence to the regional centralized control route handling terminal.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.