Method for planning distribution network with reliability constraints based on feeder corridor
US11954409B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 2, 2021 |
| Grant date | Apr 9, 2024 |
| Priority date | — |
| Expiry date | Dec 29, 2042 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S40/20
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
The present disclosure provides a method for planning a distribution network with reliability constraints based on a feeder corridor, including determining installation states of respective elements in the distribution network; determining an objective function, the objective function being an objective function of minimizing a total investment cost of the distribution network; obtaining fault-isolation-and-load-transfer time and fault recovery time in a case where the feeder segment of each feeder line that is contained in each feeder corridor fails; determining constraint conditions including reliability constraints; building a distribution network planning model according to the objective function and the constraints; and solving the distribution network planning model built to obtain optimal solutions as planning states and reliability indexes to plan the distribution network.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.