Patent · US Active

Early warning method for safety production risk of tailings pond based on risk ranking

US11954415B2 · kind B2 · utility

1Cited by
0References
8Claims
0Family size

Assignees

Inventors

Key dates

Filing dateNov 9, 2023
Grant dateApr 9, 2024
Priority date
Expiry dateNov 9, 2043

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02A90/10
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

An early warning method for safety production risk of tailings pond based on risk ranking is provided. The early warning method includes: monitoring and collecting internal basic data of a tailings pond in real-time, and performing a basic monitoring and a basic early warning; collecting geographical location data, meteorological data, and historical geological disaster data of an area where the tailings pond is located; performing risk ranking on a safety production risk of the tailings pond, thereby obtaining a risk level of the tailings pond; and collecting case data of global tailings pond accidents and hazard degree data thereof, acquiring accident solution strategies for the global tailings pond accidents, performing management and monitoring on the tailings pond, setting parameters in a process of the basic monitoring, and performing a ranked early warning on the safety production risk of the tailings pond based on the risk level.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.