Patent · US Active

Method for constructing large-span station with two-wing open type half-cover excavation and half-reverse construction

US11959243B2 · kind B2 · utility

0Cited by
3References
10Claims
0Family size

Assignees

Inventors

Key dates

Filing dateJul 24, 2023
Grant dateApr 16, 2024
Priority date
Expiry dateJul 24, 2043

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02A30/60
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for constructing a large-span station by two-wing open type semi-covered excavation and semi-reverse construction, is divided into three stages of excavation. First, excavate a first-stage inner small foundation pit, then excavate a second-stage annular foundation pit within the first-stage retaining piles and outside the range of the first-stage inner small foundation pit, and finally excavate a third-stage semi-covered excavation foundation pit below the first-stage inner small foundation pit and the second-stage annular foundation pit. By setting graded retaining piles, middle upright post piles, middle top plates, local waist beams and local concrete supports in the soil-rock combination strata, so that the force transfer between the foundation pit enclosure and the station main body structures and the underlying rock layer is clear and reliable, and a stable frame structure is achieved.