Infrastructure for automating rollout of database changes
US11971783B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 23, 2023 |
| Grant date | Apr 30, 2024 |
| Priority date | — |
| Expiry date | Jun 23, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F2201/80
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method includes decoding, by at least one hardware processor, a notification of a changed database code of a database. A query is executed responsive to the notification. The query indicates a data processing command and a data object in the database. A regression in the changed database code is detected based on multiple regression testing operations applied to the data processing command and the data object. Analysis of the regression is performed to detect a rollout parameter of a plurality of rollout parameters as a root cause of the regression. The plurality of rollout parameters are associated with the changed database code. A determination is made on whether to perform a mitigation action for the regression based on the rollout parameter.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.