Phase-based access permissions for multi-phase projects
US11972375B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 20, 2021 |
| Grant date | Apr 30, 2024 |
| Priority date | — |
| Expiry date | Jul 20, 2041 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q50/08
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
An example computing system is configured to: (i) apply a first access permission setting that defines whether a party can access a data object associated with a multi-phase construction project during a first phase of the multi-phase construction project; (ii) determine that the multi-phase construction project has transitioned from the first phase to a second phase; and (iii) based at least on the determination that the multi-phase construction project has transitioned from the first phase to the second phase, apply a second access permission setting that defines whether the party can access the data object associated with the multi-phase construction project during the second phase of the multi-phase construction project, where the second access permission setting differs from the first access permission setting.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.