Job agent-based power-capping of systems
US12001256B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 9, 2021 |
| Grant date | Jun 4, 2024 |
| Priority date | — |
| Expiry date | Oct 14, 2042 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02D10/00
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A technique includes an agent executing on a plurality of nodes while a job is being concurrently executed by the plurality of nodes. The plurality of nodes is power-capped by an existing node power consumption budget. The technique includes managing power consumption of the plurality of nodes. The managing includes the agent determining a performance footprint that is associated with execution of the job; and the managing includes the agent determining a second node power consumption budget based on the performance footprint. The second node power consumption budget is different than the existing node power consumption budget. The managing includes the agent providing a power consumption request to a global power dispatcher to set a new node power consumption budget for the plurality of nodes.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.