Patent · US Active

Hydraulic integrity analysis

US12006819B2 · kind B2 · utility

1Cited by
8References
7Claims
0Family size

Assignee

Inventor

Key dates

Filing dateJan 18, 2022
Grant dateJun 11, 2024
Priority date
Expiry dateJan 18, 2042

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/26
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

An economical process in which cement sheath integrity, perforation cluster spacing and frac plug integrity can be assessed for every frac stage, potentially leading to improvements in stimulation, completion, cementing and drilling practices. It is based on analyzing wellbore pressure responses occurring at key segments of the wireline pump-down and perforating operation and correlating the results among multiple frac stages and wells in a field or play. A special requirement is that the frac ball (ball check) is inserted in the frac plug and pumped to seat prior to performing perforating operations. A complementary benefit of this process is that selectively establishing injectivity in the most distant perforation cluster can be used to establish inhibited HCl acid (wireline acid) coverage across all perforation intervals for uniform reduction in near-wellbore tortuosity.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.