Patent · US Active

Method for constructing six-degree-of-freedom ROV operation simulation platform

US12019960B1 · kind B1 · utility

0Cited by
0References
3Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 26, 2023
Grant dateJun 25, 2024
Priority date
Expiry dateOct 26, 2043

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F30/15
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method for constructing a six-degree-of-freedom ROV operation simulation platform comprises an integrated control platform, an instructor control system, a marine environment simulation system, a simulation platform calculation system, an ROV control system, a display system and a database storage system; wherein the construction method comprises (1) calculating a hydrodynamic coefficient and a time delay function of a mother ship according to a profile of the mother ship; (2) establishing a finite difference model of umbilical cables and tethers by adopting a beam model, and calculating a shape and tensions at both ends; step (3) establishing boundary conditions of the umbilical cables and the tethers in a coupling model; (4) modeling a tether management system by using a bar element model; (5) establishing a nonlinear ROV maneuverability equation; and (6) establishing a dynamic model of the manipulator considering a pose of the ROV.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.