Method for constructing six-degree-of-freedom ROV operation simulation platform
US12019960B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 26, 2023 |
| Grant date | Jun 25, 2024 |
| Priority date | — |
| Expiry date | Oct 26, 2043 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F30/15
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method for constructing a six-degree-of-freedom ROV operation simulation platform comprises an integrated control platform, an instructor control system, a marine environment simulation system, a simulation platform calculation system, an ROV control system, a display system and a database storage system; wherein the construction method comprises (1) calculating a hydrodynamic coefficient and a time delay function of a mother ship according to a profile of the mother ship; (2) establishing a finite difference model of umbilical cables and tethers by adopting a beam model, and calculating a shape and tensions at both ends; step (3) establishing boundary conditions of the umbilical cables and the tethers in a coupling model; (4) modeling a tether management system by using a bar element model; (5) establishing a nonlinear ROV maneuverability equation; and (6) establishing a dynamic model of the manipulator considering a pose of the ROV.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.